Skyland United Methodist Church
Asheville, NC

DESCRIPTION
Continued growth and the recent acquisition of adjacent property prompted a master planning process, which led to a Phase One schematic design that includes:  10 new classroom spaces, a 7-office administration suite, enclosed walkways, covered drop-off, additional parking, choir practice area, a media room, handicapped upgrades and storage. The new building design will consolidate all of the existing buildings on the campus.

SERVICES
+ Needs assessment & master planning
+ Code analysis
+ Cost analysis
+ Phasing plan
+ Architecture, with renderings
+ Assistance with fundraising
 



 

[1] [2] [3] [4] [5]
[6] [7] [8] [9] [10] [11]

     
©2002-2007 Yurko Design & Architecture, P.A.  All rights reserved.